Kitchen Update: box Installation begins

Last week was about making boxes.  Too boring for a blog post.

This morning (very early this morning) cabinet installation started.

The bottom box will be all drawers, the upper will be pull out pantry type shelving.

Note:  exposed wires will be retrofitted into microwave and coffee maker in the next upper unit.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *