Patio Build: trim out day 5

Yesterday was a long, correction, very very long day.  As you can see the ceiling bead board is almost done, except for the light trim rings, ceiling fans, and ceiling speakers (argh…those exceptions).

Heat, humidity, and lack of a breeze are slowing progress and making working conditions intolerable.

More to come soon.

This entry was posted in Home renovation. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *